North American Network Operators Group Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical Re: MAE-East still no generator
On Sun, 8 Sep 1996, Avi Freedman wrote: > > If reliable power is not considered an essential part of facility > > infrastructure, how would you suggest that tenants get it? I think > > DC power is provided at all MFS facilities I'm aware of; the rub is > that most of our gear is AC. Does anyone know of inverters that take > MFS's -48dc (with what I'm told is 'positive-ground' power) and convert > it to 110vac? If not, we're probably going to have to build our own > battery rack and/or stick a generator on the roof at one of our MFS > colo sites. Ok, I am not opening the GraybaR Power & Protection catalog..... Page 12-31 Square D Company Modle# Power Raiting Input Output Dimensions 6154-02 500 VA -48 VDC 120/220/230/240 VAC 7x17x15 6114-02 1 kVA -48 VDC 120/220/230/240 VAC 7x17x15 6115-02 2 kVA -48 VDC 120/220/230/240 VAC 17.5x17x15 6224-02 3 kVA -48 VDC 120/220/230/240 VAC 17.5x17x15 Nathan Stratton CEO, NetRail, Inc. Tracking the future today! --------------------------------------------------------------------------- Phone (703)524-4800 NetRail, Inc. Fax (703)534-5033 2007 N. 15 St. Suite 5 Email [email protected] Arlington, Va. 22201 WWW http://www.netrail.net/ Access: (703) 524-4802 guest --------------------------------------------------------------------------- "Therefore do not worry about tomorrow, for tomorrow will worry about itself. Each day has enough trouble of its own." Matthew 6:34 - - - - - - - - - - - - - - - - -
|