North American Network Operators Group Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical Re: MAE-East still no generator
On Sat, 7 Sep 1996, Andrew Partan wrote: > > Check out the nice graph of MAE-East for that last 5 days. When are they > > going to get a generator installed? Why can't you pay for a generator when > > you are charging +30 people $5,700 a month? > > I was over at MAE-East installing some equipment sometime early > this summer & I was talking with some MFS folks. They were looking > at the AC powered gear that I was installing & were wondering why > I did not do DC - they said that there was *lots* of DC capacity > (all battery backed) at MAE-East. Last week I was over there again > & poked around. I think that I only saw *two* folks that were > using DC - everyone else was on AC. > > So what are you using? AC or DC? If you are not on DC, I would > switch. Maybe you would have better luck. The lame extended NetEdge thing, I am moving to a 7505 with and Cascade 9000 with a OC3c to my POP in Arlington. When I do that I will be DC. The DC is all battery backed, but it is not on a generator and has gone down many times. > As far as uptime goes - some folks have not seen any outages - > Digex has been up for 3+ weeks; ICM for 2+ weeks. It does look > like all BGP sessions reset 2days9hours ago. > [email protected] (Andrew Partan) > Nathan Stratton CEO, NetRail, Inc. Tracking the future today! --------------------------------------------------------------------------- Phone (703)524-4800 NetRail, Inc. Fax (703)534-5033 2007 N. 15 St. Suite 5 Email [email protected] Arlington, Va. 22201 WWW http://www.netrail.net/ Access: (703) 524-4802 guest --------------------------------------------------------------------------- "Therefore do not worry about tomorrow, for tomorrow will worry about itself. Each day has enough trouble of its own." Matthew 6:34 - - - - - - - - - - - - - - - - -
|