I think maybe the reason
you are being flamed is because generally people put in charge with the design/roll
out of a data center environment should already know something about the
logistics of such a project. Whether it is power, network, or pretty much any
aspect of it for that matter. Also it can be fairly hard to determine the power
requirements of a location without specific information, and the lack of said
information probably frustrated people.
Just a little editorial
on why you may be getting flamed.
-Drew
-----Original Message-----
From: Dan Lockwood
[mailto:[email protected]]
Sent: Friday, April 04, 2003 2:17
PM
To: [email protected]
Subject: Datacenter
electrical/genset
To throw some water on the flames
that I have been receiving, I will be posting a summary of everyone's good
information this weekend when I get time. It is my intention to make that
information available to the community. Calling me names is childish and
unnecessary. Again, thanks to those that took the time to participate.
Dan Lockwood