North American Network Operators Group

Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical

Re: Building a NOC

  • From: Leigh Porter
  • Date: Wed Mar 25 14:43:51 1998

Rod Nayfield wrote:

> We also put drip pans which cover the entire ceiling over the data center -
> we were burnt 2 years ago in a pre-war office building in NYC.  (avoid space
> with wc's above!)  The pans drain outside of the machine room into a
> high-traffic hallway (with a drain).  Any drips get noticed very quickly,
> and we don't have to test the water alarm.

  Which war? Theres been so many of them :)

--
Leigh