NANOG Meeting Presentation Abstract

Data Center Needs, Problems, and Technology
Meeting: NANOG14
Date / Time: 1998-11-09 7:30pm - 9:00pm
Room:  
Presenters: Speakers:
Sean Donelan, Data Research Associates.
Bill Norton, Equinix.
Abstract: Scribe Notes



(The group (about 120 people) met from 7:30-9:00PM Monday evening to discuss the issues folks have run into constructing and operating Internet Data Centers. It seemed like about a dozen or so in addition to the panel had constructed or were installing Internet Data Centers and shared their experiences in the finest tradition of a BOF. Many others contributed observations and suggestions as well based on their experiences with Internet facilities. I\'ve tried to capture the nature of the discussion from these notes. After we ran out of time many folks adjourned to a room upstairs and continued expanding the notes a bit in smaller focus groups. I wasn\'t involved in all of these discussions and folks added stuff to the lists. I\'ve tried to capture these additions as well. )



I\'ve included two appendices: Michael P. Lucking contributed a worksheet for calculating BTU cooling units required for data centers, and I added the panels conference call notes highlighting discussion points that we may not have covered during the BOF.




Format of this document



We came up with a list of Internet Data Center Issues and came up with recommendation based on experiences of the group. The intent was to share information about critical infrastructure support and not necessarily cover all aspects of data center construction. The hope is that this document will help folks know what to look for in stable infrastructure in which to put our Internet equipment.




Power



Big issue here is grounding for which there are military specs (source?)



Internet Data Centers are moving to requiring both AC and DC. There was some debate over the relative benefits of AC (that\'s all most ISPs know) and DC (cleaner more consistent).



Security of the grounding system itself. One can tap into the data system through grounding system.



Resources: IEEE Emerald Book which describes data and electrical grounding, and the Green Book which goes into commercial grounding, and NEBS Standards for office space delivery.



There is a multi-point vs. single point grounding tradeoff. The recommendation is to use multi-drop for simplicity of engineering reasons.



Recommendation for a telephone, electrical outlet and flashlight, telescoping dental mirror, and headtop mining lights in the power room. Make sure you have in stock extra brass (melting) fuses (100Amp, 300Amp, 600Amp bars).



Have EPO Panic button with cover



2n/n+1 redundancy required for all critical facilities



Consider stronger than expected power for facilities staff workstations.



Emergency power off is part of the code. There is a code difference between a facilitiy called a "Computer Room" and other names. The suggestion was that you may be better off using another name because the codes for a computer room may require non-optimal implementations for Internet Facilities.



Power conditioning required. The noise and frequency of serious spikes varies and requires you to condition the lines.



Checking on power shouldn\'t require power



Backups UPS/Generator Power for the facility dictates how long humans can inhabit the facility and therefore determines the life of the facility. Security systems need to be on the same protected power system as the rest of the facility.



Redundant power through multiple grids is non-trivial to do but highly desirable. Experience has shown that Internet facilities typically have A/B Buss for power and 30Amps delivered to each rack.



Some recommendation for data and power lines to be on different planes. Power and data overhead needs to be well supported (weight concern) and in seismic areas well braced.



A recommendation was made for fiber-impregnated batteries to avoid acid on the floot.



Most importantly, all Internet Facilities must have generators for surviving long-term power outages (especially as we go through competitive deregulation in the power industry…) Diesel fuel may raise EPA issues in some areas. Diesel fuel contamination is an issue and a solution that some have includes multiple fuel tanks. Contracts for trucking in additional fuel is suggested, however it is also pointed out that during this type of crisis, other (emergency support, police, hospital, etc.) facilities may get priority service, and indeed your supplier may not have the robustness required. Fire drills here may help. Dual contracts for fuel delivery was also suggested.




HVAC



The cooling needs are unique to Internet Data Centers. The amount of heat generated by some of this equipment is extreme and highly variable in our industry.



Chilled water cooling was recommended for equipment and heating/cooling accomodations for emergency staff



Rule of thumb is KW/20=t where t is the number of tons of cooling required.



Tradeoffs include raised floors versus relay racks



Important issues include redundancy for HVAC systems



Load shedding protocol - when to turn off monitors in data center?



Monitor HVAC system



Humidity - over cooling causes condensation on equipment, too dry leads to excessive static



Watch for hotspots and cold spots. One exchange is frigid cold under vent and still hot elsewhere.



Use clean/soft/distilled water



Failure mode for HVAC should be open/full blast AC



Separate venting for Internet Data Center than for broader building.



All AC should be on same power system as the rest of the data center



Water pipes/drain pipes above facilities raises concerns. Upper floor drains clogging as well. One solution was rubberized floors above data center.



One concern was that the facility is volatile organic compounds (Radon, etc.). An approach would be to specify X number of air changes per hour. 85% filtration of outside air was recommended.



Problem resolution of HVAC then needs to be pulled into the NOC in some way…



Standing water is bad - condensation trays and sewer backup system stories.



Timely A/C maintenance is required.



Fire Suppression



Pre action sprinklers - require air in pipe prior to water


Two stage systems are recommended that trigger only when two zone sensors go off.


Trigger in different zones as needed


Highly desirable to have a standby switch to abort firing of the system.



In some areas trigger needs to also cut power...


Fire Drills required prior to opening Internet Data Center. This may be expensive. In some area, 2 firings is required separated by 20 minute ventilation time.


FM200 system is common as a replacement for Halon, water and chemical systems.


Heat sensors and smoke sensors are require.


Disaster recovery issues


Drains


Drills and training of staff


Recommendation to talk with local fire company


Make sure fire alarm causes security system failure is full open for fire department


Need manual forced dump (this was added upstairs and I don\'t know what is meant here.)


Need many large extinguishers




Physical Security



Recommended that walls stop at concrete and their should be no raised ceilings



Cellular phone for alarm and monitoring system



Battery backups for entry access system - how long should the facility stay up after the loss of power? > 6hrs required.



Fire proof high stress shatterproof glass



Pizza PO to prevent engineer riots, Coffee sushi & espresso in emergency facilities



Fire alarm defeats security system for safety reasons



Keyed (personal) biometric access control & off-site loggin



Air lock - one at a time - access. No piggy back entry.



Motion detectors



 
Cable Management



tie wrap - not too tight or velcro screwed down


Fiber - square open face conduit


Horizontal fiber management units


In-rack cable tie-down panels


Bundles and patch panels (e.g. 50 pair or 100 pair copper, 24 or 48 strand fiber - single and multimode.)




Data Plant



T1 cabling


Cat 5 cabling


T3 distribution - no crimp connectors!


Hierarchical - T1/T3/ther/Finber


Patch Panels


Star or modified star topologies


DACS - CNR


T1 in-line testing


DSX Panels


Optical splitter/monitor patch fees.



 
Fire Drills
Importance - some test facilities weekly. Alarms going off, etc.



General Issue



Across all topics there is a Y2K issue.



Layer 1 Recommendations



Use of 506 category


We discussed the importance of fiber entrance diversity, that is, the ability for multiple carriers to enter the facilities through different paths. The use of existing vaults, tunnels, shopping malls, and wireless were mechanisms to accomplish this.



We also pointed to the importance of locating data centers along telco fiber meet paths. This would make multiple carrier ingress into the facilities easier. The issue then becomes "How do we find out where the carriers lay their fiber so we can pick a good location for the Internet Data Center? Suggestions included by looking at building permits which are public records, asking install crews on the street doing an install, and simply asking the telco (maybe requiring NDA, previous relationships, and perhaps \$$ volume)





Voice Communication




We didn\'t get to discuss this.




Flooring & Ceiling



We didn\'t get to discuss this.



Where to find Information on Data Centers?




Discussions with CLECs and Vendors


Requirements lists for Heating, Venting, Air Conditioning and responses from construction responses


Banks and Military and Financial instituions already have fairly robust generic data center specs (where?)


Telcos use Bellcore docs - describing wiring standards (how to get these?)



Data Center Mailing List:


send a message to [email protected] with \"subscribe datacenter\" in the body.




Quote of the Day



"Build your data center next to someone who needs it more than you do."



 



 


 



Appendix A - Calculating BTU Cooling Units



This spreadsheet contributed by \"Michael P. Lucking\" <[email protected]>



All temps are in degrees F.


1) Windows exposed to the sun:



Use only one exposrue: Select the one that gives the largest result


if no venetian or shading device is available mult X 1.4



1.1) South ____ sq. ft x (Max outside temp - 30) = _____ BTU/HR


1.2) E/W/SE ____ sq. ft x (Max outside temp - 3) = _____ BTU/HR


1.3) NW ____ sq. ft x (Max outside temp - 23) = _____ BTU/HR


1.4) NE ____ sq. ft x (Max outside temp - 25) = _____ BTU/HR


1.5) N ____ sq. ft x (Max outside temp - 85) = _____ BTU/HR



Answer for #1 MAX (1.1 - 1.5)



2) All Windows not included in Item 1 (interior windows etc)


___ sq. ft x (Max exposure temp - 69) = _____ BTU/HR



3) Walls exposed to sun


(Use only the wall with the eposure used in item 1)



3.1) Light Construction ____ Lin. ft x (Max outside temp - 25) = _____ BTU/HR


3.2) Heavy Construction ____ Lin. ft x (Max outside temp - 55) = _____ BTU/HR





Heavy defined at 12\" masonry or insulation.



4) Shade Walls not included in Item 3


____ Lin. ft x (Max outside temp - 55) = _____ BTU/HR



5) Partitions


(Interior Wall adjacent to an unconditioned space)


____ Lin Ft x (Max temp - 50) = _____ BTU/HR



 


6) Ceiling or roof



6.1) Ceiling with Unconditioned occupied space above


___ Lin Ft x (Max temp - 90) = _____ BTU/HR





6.2) Ceiling with Attic Space above


6.2.1) No Insulation ___ Sq Ft x (max temp - 83) = _____ BTU/HR


6.2.2) 2\" or more ___ Sq Ft x (max temp - 90) = _____ BTU/HR


6.3) Flat roof with no ceiling below


6.3.1) No Insulation ___ Sq Ft x (max temp - 85) = _____ BTU/HR


6.3.1) 2\" or more ___ Sq Ft x (max temp - 90) = _____ BTU/HR



7) Floor


(over unconditioned space or venter crawl space. ignore any heat


gain from floor directly on ground or over unheated basement)



____ sq. ft x (Max temp - 90) = _____ BTU/HR



8) People (includes allowance for ventilation)



____ x 750 = _____ BTU/HR



9) Lights (if total wattage is know use 9.1 else 9.2)


9.1) ____ Watts x 4.25


9.2) ____ (sq ft floor space x 3 )Watts x 4.25



10) Computer load (some computers/routers acctually supply BTU/HR ratings


else you will have to calculate it)


10.1) Total BTU/HR for all machines


10.2) Total max wattage x 3.4 = _______ BTU/HR



______________________


Sum all the BTU/HR, this is your total load factor.



 



Appendix B - NANOG 14 Data Center BOF Pre-Meeting Conference Call for Discussion Points



Data Center Needs, Problems and Technologies


NANOG 14 BOF 7:30-9PM



On Conference Call:


Bill Norton <[email protected]>


Sean Donelan <[email protected]>


Jay Adelson <[email protected]>


Juston Newton <[email protected]>



Abstract:


Internet facilities need to grow more robust to meet the needs of today\'s networking environment. Outages due to air conditioning problems, accidental circuit pulls, and shortages of space and bandwidth at collocation and exchange facilities all lead to reliability issues that now affect millions of users worldwide. This BOF is intended to highlight concerns and technology problems that affect the robustness of the Internet Data Center facilities. We hope that specific recommendations on areas for improvement in infrastructure can be made that the community can adopt when constructing or improving infrastructure facilities.



We discussed a few approaches for this BOF and agreed that the BOF should be informal, with perhaps a welcome and brief introduction of the panel by Bill, and a discussion of Internet Facilities Issues.



Discussion Points


-----------------


Confidentiality Issue - so many are hiding mistakes, as an industry we are failing to effectively learn from others mistakes. This BOF is a sharing forum.



Hollywood vs. Reality - apprearance of reliable production data centers often are much duller than what folks may expect, focusing on function vs. form.



Biggest Problems Facing Internet Facilities - Managing Growth.


Cable Management - keeping track of # of cables, what goes where, the decision to leave a cable or pull it, how many cables to pre-install. Which exchange point do you think can best track down a wire failure? Sophisticated SW for doing this stuff exists.



No Internet Standards for facilities.


BellCore classes exist for TelCo


BICSI - Building Industry Cable Standard Institute defines standards for # of data ports for an office building for example (TIA568).



Data Industry - Not Invented Here Syndrome. All Internet Engineers have a religious view about the \"right\" way for a closet to look. We need something like a common practices resource for hub/cable layout.



Phone companies have folks dedicated to nothing but cable plant installs. Don\'t let folks do their own wiring.



Power in Data Centers - Planning is difficult. Planning for power maintenance. Example: Single panel for power feed and UPS feed; panel can not be serviced without losing both UPS and power feed.



Some Resources on Power may be available for our community:


NEBS stds on power


Military standards on power


Hospital standards on power


Service Requirements for \"Critical Services\" - recover in < 6 seconds


Service Requirements for \"Essential Services\" - recover in < 10 minutes


Service Requirements for \"Routine Services\" - recover in < 2 hours



Design of Data Centers - who is qualified? Any Internet Engineer? What expertise is required to build a commercial grade internet facility? There is no \"Certified Data Center Consultant\", no good stds or common practices docs.


Jay brought up his current experience of hiring a construction company that has on staff folks from large data center (IBM, etc) crews. Expertise includes experience on 100% availability services provisioning: hospital, police stations, financial markets, military.



Testing Internet Facilities and Fire Drills



Power Factor Discussion



Internet World rapidly deploying and adding UPS as afterthought. UPS=power conditioning, where Electrical Engineers would focus on building from the ground up \"Power Redundancy\".



Jay can talk about Trade Offs in building facilities. Building on a budget, expansion critieria.



Broader issue - how to build quality Internet Facilities into existing office space? Can it be done?



Comments/Additions welcome...



Bill
Files: None.
Sponsors: None.

Back to NANOG14 agenda.

NANOG14 Abstracts

  • Technology for Backbone Web Caching
    Moderators:
    Peter DanzigNetwork Appliance; .
    Panelists:
    James AvianiCisco Systems; .
    Shirish SathayeAlteon; .
    Bill MaggsMCI; .
    Speakers:
    Ed KernDIGEX; .
  • Technology for Backbone Web Caching
    Moderators:
    Peter DanzigNetwork Appliance; .
    Panelists:
    James AvianiCisco Systems; .
    Shirish SathayeAlteon; .
    Bill MaggsMCI; .
    Speakers:
    Ed KernDIGEX; .
  • Technology for Backbone Web Caching
    Moderators:
    Peter DanzigNetwork Appliance; .
    Panelists:
    James AvianiCisco Systems; .
    Shirish SathayeAlteon; .
    Bill MaggsMCI; .
    Speakers:
    Ed KernDIGEX; .
  • Technology for Backbone Web Caching
    Moderators:
    Peter DanzigNetwork Appliance; .
    Panelists:
    James AvianiCisco Systems; .
    Shirish SathayeAlteon; .
    Bill MaggsMCI; .
    Speakers:
    Ed KernDIGEX; .
  • Technology for Backbone Web Caching