  • Domainkey-signature: a=rsa-sha1; c=nofws; d=gmail.com; s=beta; h=received:message-id:date:from:to:subject:cc:in-reply-to:mime-version:content-type:content-transfer-encoding:content-disposition:references; b=g7hlyZptjNtt7F/831h5jZb7ZmtTiQlRhc6of0nmACHIGw3ezxpDKeNP7wqPyDo+qFYEy7d0vFReDQAMH5vYgTrDB8JgDoqrS8gbFMvvu/tb/JDmGLTWZ0oAT+bS/hjekZsCWN+ToVFOQ04UqVV3mRYakzjDvzPRlRdxsCjlzIk=


On 1/25/07, Paul Vixie <[email protected]> wrote:

> How long before we rediscover the smokestack? After all, a colo is an > industrial facility. A cellar beneath, a tall stack on top, and let physics > do the rest.

odd that you should say that.  when building out in a warehouse with 28 foot
ceilings, i've just spec'd raised floor (which i usually hate, but it's safe
if you screw all the tiles down) with horizontal cold air input, and return
air to be taken from the ceiling level.  i agree that it would be lovely to
just vent the hot air straight out and pull all new air rather than just
make up air from some kind of ground-level outside source... but then i'd
have to run the dehumidifier on a 100% duty cycle.  so it's 20% make up air
like usual.  but i agree, use the physics.  convected air can gather speed,
and i'd rather pull it down than suck it up.  woefully do i recall the times
i've built out under t-bar.  hot aisles, cold aisles.  gack.

Seriously - all those big old mills that got turned into posh
apartments for the CEO's son. Eight floors of data centre and a 200
foot high stack, and usually an undercroft as the cold-source. And
usually loads of conduit everywhere for the cat5 and power. (In the UK
a lot of them are next to a canal, but I doubt greens would let you
get away with dumping hot water.)