North American Network Operators Group

Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical

Re: Presumed RF Interference

  • From: Martin Hannigan
  • Date: Sun Mar 05 23:20:47 2006

At 05:32 PM 3/5/2006, Peter Dambier wrote:

David Lesher wrote:

Cut the ground wire in your power cords but ground the equipment directly
to a metal frame.
[ I am not a PE - IANAPE ]

I don't think that is good advice. You can't possibly have the
as-builts, existing condition, or line drawings in front of you.

Safety first. Call the consulting engineers.


-M<





--
Martin Hannigan (c) 617-388-2663
Renesys Corporation (w) 617-395-8574
Member of Technical Staff Network Operations
[email protected]