North American Network Operators Group

Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical

Re: Equinix Chicago Power Outage

  • From: Richard A Steenbergen
  • Date: Sat Jun 25 04:23:35 2005

On Sat, Jun 25, 2005 at 12:37:00AM -0700, Wayne E. Bouchard wrote:
> 
> Word is that they went back to utility power about 30 minutes ago and
> they're declaring the emergency over.

Now begins the fun process of pulling all the gear that got fried during 
the power surges. :)

For a good link on the incident:

http://www.belleville.com/mld/belleville/news/local/11981877.htm

-- 
Richard A Steenbergen <[email protected]>       http://www.e-gerbil.net/ras
GPG Key ID: 0xF8B12CBC (7535 7F59 8204 ED1F CC1C 53AF 4C41 5ECA F8B1 2CBC)