North American Network Operators Group Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical Re: Optigate
On Mon, Aug 25, 2003 at 09:17:49AM -0700, Mark V. A. Bown wrote: > > This morning at 4:30am pst 200 Paul St. facility in San Francisco went > dark. The power died and took our 200 Paul St. Router offline. The power > was restored at 8:00am pst. I think you mean PDT. Also, while DC went out at 4:30AM and was restored at 8:00AM, AC power went out at around 3:00AM and wasn't restored until 8:30AM. -- Richard A Steenbergen <[email protected]> http://www.e-gerbil.net/ras GPG Key ID: 0xF8B12CBC (7535 7F59 8204 ED1F CC1C 53AF 4C41 5ECA F8B1 2CBC)
|