North American Network Operators Group Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical Re: Re[2]: telehouse - 25 broadway
Actually I think Exodus will run em for a week or two as a test.. Brian "Sonic" Whalen Success = Preparation + Opportunity On 15 Sep 2001, Sean Donelan wrote: > > I'm sure a full analysis will be performed after the recovery > efforts are completed. I'm also certain the operators of > both 25 Broadway and 32 Old Slip are working very dilgently > to get them running. > > But I would like to point out, no one regularly runs their > generators for 48+ hours as part of a normal test. In addition, > most standby generators are fitted only for "limited" duration > runs. You should expect problems during any extended run of a > generator plant. I'm a bit surprised that 25 Broadway and > 32 Old Slip are the only ones we've heard about. > > Until I know a bit more about what happened, I can't say > whether any alternative design could have performed better. > > On Sat, 15 September 2001, Joe McGuckin wrote: > > Was this unit tested regularly? With a load bank? > > > > If there was a weekly test run, why wasn't this problem caught? > > > > It seems like there's a lesson to be learned here. > > > > My guess is that many sites' idea of a periodic test is to fire up the > > generator (without a load) for 5 or ten minutes and assume everything's ok. > > > > How many folks actually perform a load transfer to the generator during > > testing to check out the transfer switch ? > >
|