North American Network Operators Group Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical RE: Seattle Earthquake
-----BEGIN PGP SIGNED MESSAGE----- Hash: SHA1 Latest word on Sea-Tac's website is that they are now operational in limited capacity. There is no runway damage reported. They are currently operating with 20 mile separation instead of the normal 3-5 mile separation. Boeing field, which is about 5-10 miles north of SEATAC, has a cracked runway and is expected to be offline for a couple of days. - -----Original Message----- From: Jake Khuon [mailto:[email protected]] Sent: Wednesday, February 28, 2001 2:42 PM To: Wayne Bouchard Cc: Matthew Schlegel; [email protected] Subject: Re: Seattle Earthquake ### On Wed, 28 Feb 2001 15:15:54 -0700, Wayne Bouchard <[email protected]> ### casually decided to expound upon Matthew Schlegel ### <[email protected]> the following thoughts about "Re: Seattle ### Earthquake": WB> SEATAC is still closed Control tower damage and cracks in the runway. - -- /*====================[ Jake Khuon <[email protected]> ]======================+ | Senior Manager and Chief Architect, Net-Eng/NSM /~_ |_ () |3 /-\ |_ | | VOX: +1 (206) 910-8328 Fax: +1 (425) 415-1443 \_| C R O S S I N G | +=============[ 900 4th. Ave., Floor 12, Seattle, WA 98164 ]=============*/ -----BEGIN PGP SIGNATURE----- Version: PGPfreeware 6.5.8 for non-commercial use <http://www.pgp.com> iQA/AwUBOp2CSStAKYXwpQg1EQJHJQCeNGxYfyPSyRRPmtLphmdz3yxxL0cAnjtl F9UIjbdtca7N6rGxi+VC0YoW =GeDz -----END PGP SIGNATURE-----
|