North American Network Operators Group Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical Re: Next NANOG
On Wed, Feb 28, 2001 at 08:23:19AM -0800, Lucy E. Lynch wrote: > Our big costs were US West curcuits into the hotel (6xT1 - we could have > gotten away with 4xT1) and cable - we had lenghts cut to fit the table > layout in the ballroom. We had switches & such on hand, and we "borrowed" > terminal room machines from one of the student labs - If these costs were negligible, how much would it have cost? (assuming, for example, an 802.11b shot from a hotel to an already- connected nearby building, donated transit, doing wireless-only in the conference and having some friendly vendor loan the machines for the terminal room). Joe
|