North American Network Operators Group

Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical

Re: BBN (GTE) Suffers another major power problem.

  • From: William Duncanson
  • Date: Fri Aug 08 23:18:16 1997

> I'll be more than happy to leverage my experience from my Nuclear 
> Engineering days to help Internet companies plan for these redundant
> power plants.  Each load of fuel would be good for about 18 to 24 
> months of sustained operation, and we could even design it so that
> should it experience an explosion, there is no confusion or expectation
> on the performance and viability of colocated and nearby equipment.
> 
> Chris
> 
Sign me up!  I want one of these in my back yard.  I figure I could
probably run the whole block off of one of these.

-- 
  ___  ____ __
 | _ \/ __/|  \   William S. Duncanson @ PSA Austin           512-343-1111    
 |  _/\__ \| \ \  Artificial Intelligence stands no chance against Natural 
 |_|  /___/|_|__\ Stupidity_______________________________________________
Email: [email protected]         Pencom/PSA         http://www.pencom.com/
Pager: [email protected]          http://www.starkreality.com/