   Or, lets say, an automatic network monitor (ALA SNMP) that tells them 
   when UPS power is about to run down (before the lights go out) so they 
   can roll their generator into place.

Or, more likely, assuming that the story about a contractor popping an
upstream distribution breaker was correct, that the generator and
transfer switch were upstream from _that_ breaker (which would make it
quite unlikely that power would flow).

                                        ---Rob