North American Network Operators Group

Date Prev | Date Next | Date Index | Thread Index | Author Index | Historical

RE: MAE-East still no generator

  • From: Jim Browning
  • Date: Sun Sep 08 11:27:59 1996
  • Encoding: 7 TEXT

In some telco facilities that do have AC generator backup, there are a few 
seconds of down time while the generator kicks in.  In these spaces, AC 
equipment will in all likelihood re-boot, while DC equipment stays up 
through the transition.
--
Jim


- - - - - - - - - - - - - - - - -